HDPE & PVC Pipe Supplier — Nigeria

Municipal WaterOil & GasMiningAgriculture

Primepoly is one of the most active Chinese exporters of PE100 HDPE pipe to Nigerian state water corporations, oil & gas service companies and large-scale agricultural projects. Established distributor presence in Lagos and Abuja; direct shipments to Port Harcourt for Niger Delta oil-and-gas service work.

Why Primepoly Co., Ltd. for Nigeria

Nigeria's chronic non-revenue water problem (40–55% in most cities) is driving systematic replacement of legacy ductile iron and asbestos cement mains with leak-tight HDPE. Federal Ministry of Water Resources and state water corporations have shifted standard tender language to specify PE100 SDR 17 minimum. Oil & gas service providers use HDPE flowlines for non-hazardous fluid duty to avoid the corrosion / paint maintenance burden of carbon steel.

Standards & compliance

NIS 591
Nigerian Industrial Standard for PE pipes — based on ISO 4427
SONCAP conformity
Required by Nigerian Customs — Primepoly supplies all SONCAP documentation
ISO 4427
Cited in most federal and state water-corporation tenders
WRAS / NSF 61
Required by donor-funded projects (World Bank, AfDB)

Ports & lead times

Apapa / Tin Can Island (Lagos)

32–42 days from Qingdao

Main commercial gateway for South-West Nigeria

Port Harcourt

34–44 days

Niger Delta oil & gas projects

Onne Port

34–44 days

Oil-and-gas free zone, faster customs for energy sector imports

Recommended products for Nigeria

Project reference — Nigeria

2024: 9 km PE100 SDR 17 DN 315 water-main replacement for a state water corporation, replacing failing 1980s ductile iron. Pipe-bursting trenchless install reduced surface disruption by ~ 70%. Primepoly sent a butt-fusion trainer for the first week of installation.

Nigeria — Frequently asked questions

Q. Do you supply with SONCAP / Nafdac certification?

Yes — we work with NIS-accredited inspection agencies (Cotecna, SGS, Intertek) to issue SONCAP at the loading port for every shipment. The CoC arrives at the destination port before the vessel, eliminating customs delays.

Q. Are you open to distributor partnerships in Nigeria?

Yes — we are actively recruiting distributors covering specific states or regions (Lagos / South-West, Kano / North-West, Port Harcourt / South-South). See /partners/become-distributor for terms.

Q. How do you handle payment for Nigeria-based buyers?

Standard terms: 30% T/T deposit, 70% on Bill of Lading copy. Letter of Credit at sight available for established customers ≥ USD 200,000 per year. Sinosure coverage available for first-time buyers up to 90 days post-shipment.

Q. What's the typical lead time for a 1 × 40HQ container of HDPE PE100 to Lagos?

Standard items in spec: ~ 25 days production + ~ 35 days transit + 5–10 days customs clearance ≈ 65–75 days total. OEM colour / marking adds 10 days production. Pre-positioned stock in Lagos partner warehouse possible for repeat-order customers.

Quote for Nigeria

Send your project specification (DN, working pressure, length, destination port) — our team replies within one working day with FOB / CIF pricing and a delivery schedule.