Primepoly Co., Ltd.
1 / 4

Hardware & Machinery

HDPE Butt-Fusion Welding Machine

Manual (SPA series) and automatic (W series) butt-fusion welding machines for jointing PE / PP / PVDF pipes from DN63 up to DN1200 mm. Heated-plate butt fusion produces homogeneous, monolithic joints stronger than the parent pipe — the dominant jointing method for HDPE water, gas and mining pipelines. Compliant with ISO 21307 / DVS 2207 / ASTM F2620 welding procedures and ISO 12176-1 machine certification.

  • Manual Butt-Fusion Welding Machine SPA Series
  • HDPE Butt-Fusion Welder — Detail
  • Butt-Fusion Welder Hydraulic Unit
  • Automatic CNC Butt-Fusion Welding Machine
Diameter Range
DN63 – DN1200 mm (across SPA + W series models)
Standards
ISO 21307 / DVS 2207 / ASTM F2620 / ISO 12176-1
Operating Temperature
Heating plate up to 300 °C, ±3 °C control
Applications
Water mains, gas distribution, mining, fire protection, industrial pipelines

Product Description

The Butt-Fusion Welding Machine joins HDPE, PP and PVDF pressure pipes by heated-plate fusion. It produces homogeneous, monolithic joints stronger than the parent pipe — the dominant jointing method for HDPE water, gas and mining pipelines.

Advantages and Characteristics

1. Manual (SPA series) and automatic CNC (W series) models from DN63 up to DN1200. 2. Hydraulic carriage with pre-set fusion pressure and dwell time. 3. Heating plate with PTFE non-stick surface and digital temperature control. 4. Compliant with ISO 21307, DVS 2207 and ASTM F2620 fusion procedures. 5. ISO 12176-1 machine certification ensures every joint is repeatable and traceable.

Typical Applications

1. Field welding of municipal water and gas mains. 2. Mining slurry and tailings line fabrication. 3. Workshop fabrication of fittings and spool-pieces. 4. Marine outfall and dredge spread joining at the dock. 5. Industrial chemical-process pipework.

Frequently Asked Questions

What is the minimum order quantity (MOQ) for HDPE / PVC pipe?

Standard MOQ varies by product — generally 1 ton for HDPE pipe, 500 kg for PVC pipe, and one full container for export orders. Custom MOQ is available for sample / pilot projects — contact our sales team for confirmation.

What is the typical lead time?

For stocked sizes, 7–10 days from order confirmation; for custom OD / SDR / colour, 25–35 days. Production capacity exceeds 2,000 t/month — large project orders are scheduled in batches.

Which certifications does Primepoly hold?

ISO 9001, ISO 4427, AS/NZS 4130, ASTM F714, AWWA C906, WRAS and NSF 61. Documentation accompanies every shipment, and third-party inspection (SGS / BV) is welcome at the buyer's request.

Do you offer OEM and private-label manufacturing?

Yes — we manufacture pipes and fittings to customer-specified OD, SDR, length, colour, marking and packaging. MOQ for OEM orders typically starts at 5 tons or one full container.

How are pipes packaged for export shipping?

Pipes are bundled with PE film / steel strap and stowed by length: short pipes (≤6 m) ship in 20'/40' containers; long pipes (>12 m) ship by break-bulk vessel or flat rack. Coil rolls are shrink-wrapped and palletised. Free OBL with shipping documents.

Contact Us

Our friendly customer service team is here to help with quotations, technical consulting and custom manufacturing enquiries. We reply within 24 hours.

  • Tel+852 9562 2873
  • Emailsales@primepolypipes.com
  • AddressRoom 1313, 13/F, Meisheng Center (Office Tower), No. 33 Jinshui East Road, Zhengzhou Area (Zhengdong), Henan Pilot Free Trade Zone, Zhengzhou, Henan 450000, China

Leave a Message

Our friendly customer service team is here to help with quotations, technical consulting and custom manufacturing enquiries. We reply within 24 hours.